Contract No: HK/2011/07 Wanchai Development Phase II and Sampling, Field Measurement and Testing Work
(Stage 2) Environmental
Permit no. EP-356/2009, Further Evironmental permit nos. fep-01/356/2009,
fep-02/356/2009, FEP-03/356/2009, Fep-04/356/2009 and fep-05/356/2009 Quarterly
Environmental Monitoring
and Audit Report
- March 2012 to May 2012 -
|
CLIENTS: |
|
Civil Engineering and
Development Department and Highways Department |
Lam Geotechnics Limited 11/F Centre Point Wanchai,
H.K. Telephone: (852) 2882-3939 Facsimile: (852) 2882-3331 E-mail: info@lamenviro.com Website: http://www.lamenviro.com |
|
|
|
|
|
CHECKED
by: |
|
                         Raymond Dai Environmental Team Leader |
|
DATE: |
|
20 June 2012 |
1.1    Scope of the Report
1.2    Structure of the Report
2.   Project Background
2.1    Background
2.2    Scope
of the Project and Site Description
2.3    Division of the Project
Responsibility
2.4    Project Organization and Contact
Personnel
2.5    Principle
Work and Activities
3.   Monitoring Requirements
3.1.    Noise Monitoring
3.2.    Air Monitoring
3.3.    Water Quality Monitoring
4.   Monitoring Results
4.1.    Noise Monitoring Results
4.2.    Real Time Noise Monitoring Results
4.3.    Air Monitoring Results
4.4.    Water Monitoring Results
4.5.    Waste Monitoring Results
5.1.    Noise Monitoring
5.2.    Real-time Noise Monitoring
5.3.    Air Monitoring
5.4.    Water Quality Monitoring
5.5.    Site Audit
5.6.    Review
of the Reasons for and the Implications of Non-compliance
5.7.    Summary
of action taken in the event of and follow-up on non-compliance
6.   Complaints, Notification
of Summons and Prosecution
7.   Cumulative Construction
Impact due to the Concurrent Projects.
lIST OF
TABLES
Table I        Principle Work Activities for Contract no. HY/2009/11
Table II       Principle
Work Activities for Contract no. HK/2009/01
Table III       Principle
Work Activities for Contract no. HK/2009/02
Table IV      Principle Work Activities for Contract no. HY/2009/15
Table V       Principle Work Activities for Contract no. HK/2010/06
Table VI      Principle Work Activities
for Contract no. HY/2009/19
Table 2.1      Schedule 2 Designated Projects under this Project
Table 2.2     Details of Individual Contracts under the Project
Table 2.3     Contact Details of Key Personnel
Table 2.4      Principle Work Activities for Contract no. HY/2009/11
Table 2.5      Principle Work Activities for Contract no. HK/2009/01
Table 2.6      Principle Work Activities for Contract no. HK/2009/02
Table 2.7      Principle Work Activities for Contract no. HY/2009/15
Table 2.8      Principle Work Activities for Contract no. HK/2010/06
Table 2.9      Principle
Work Activities for Contract no. HY/2009/19
Table 3.1     Noise
Monitoring Stations
Table 3.2     Real
Time Noise Monitoring Station
Table 3.3     Air
Monitoring Stations
Table 3.4      Marine
Water Quality Stations for Water Quality Monitoring
Table 3.5     Marine
Water Quality Monitoring Frequency and Parameters
Table 3.6      Marine Water Quality
Stations for Enhanced Water Quality Monitoring
Table 3.7      Marine Water Quality
Stations for Additional DO Monitoring
Table 4.1      Noise
Monitoring Stations for Contract no. 
HY/2009/11
Table 4.2      Noise Monitoring
Station for Contract nos. HK/2009/01 and HK/2009/02
Table 4.3      Noise
Monitoring Station for Contract nos. HY/2009/15
Table 4.4      Noise
Monitoring Station for Contract nos. HY/2009/19
Table 4.5     Real
Time Noise Monitoring Station for Contract no. HY/2009/11
Table 4.6     Real
Time Noise Monitoring Station for Contract no. HY/2009/19
Table 4.7     Air Monitoring
Stations for Contract no. HY/2009/11
Table 4.8      Air Monitoring Stations for Contract no. HK/2009/01
Table 4.9      Air Monitoring
Station for Contract no. HK/2009/02
Table 4.10     Air
Monitoring Station for Contract no. HY/2009/15
Table 4.11     Air
Monitoring Station for Contract no. HY/2009/19
Table 4.12    Water
Monitoring Stations for Contract no. 
HY/2009/11
Table 4.13     Water
Monitoring Stations for Contract no. HK/2009/01
Table 4.14     Water
Monitoring Stations for Contract no. HK/2009/02
Table 4.15     Water
Monitoring Stations for Contract no. HK/2010/06
Table 4.16     Water
Monitoring Stations for Contract no. HY/2009/15
Table
4.17     Water Monitoring Stations for
Contract no. HY/2009/19
Table 4.18     Summary of Water Quality Monitoring Exceedances in
Reporting period
Table 4.19    Details
of Waste Disposal for Contract no. HY/2009/11
Table 4.20    Details
of Waste Disposal for Contract no. HK/2009/01
Table 4.21    Details
of Waste Disposal for Contract no. HK/2009/02
Table 4.22    Details
of Waste Disposal for Contract no. HY/2009/15
Table 4.23    Details
of Waste Disposal for Contract no. HK/2010/06
Table 6.1     Cumulative
Statistics on Complaints
Table 6.2     Cumulative
Statistics on Successful Prosecutions
lIST OF FIGUREs
Figure
2.1     Project
Layout
Figure
2.2     Project
Organization Chart
Figure 3.1     Locations
of Environmental Monitoring Stations
lIST OF APPENDIces
Appendix
2.1  Environmental Mitigation
Implementation Schedule
Appendix 3.1  Action and Limit Level
Appendix
4.1  Noise Monitoring Graphical Presentations
Appendix
4.2  Air Quality Monitoring Graphical Presentations
Appendix
4.3  Water Quality Monitoring Graphical Presentations
Appenidx 4.3a  Additional Dissolved Oxygen
Monitoring Results
Appendix 4.4  Real-time Noise Monitoring Results and Graphical Presentations
Appendix 5.1  Event Action Plans
Appendix 6.1  Complaint Log
Appendix 7.1  Construction Programme of
Individual Contracts
Construction Activities for the
Reported Period
Table I     Principle Work Activities for Contract
no. HY/2009/11
March 2012 |
April 2012 |
May 2012 |
The major
work activities for Contract no. HY/2009/11 was confirmed substantial complete
by RSS on 4 January 2012. The construction site was handed over to contractor
HY/2009/19 and the FEP-01/356/2009 was under application of surrender in this
reporting period. |
Rectifications
of rock armour at Portion III. The major
work activities for Contract no. HY/2009/11 was confirmed substantial complete
by RSS on 4 January 2012. The construction site was handed over to contractor
HY/2009/19 and the FEP-01/356/2009 was under application of surrender in this
reporting period. |
Table II    Principle Work Activities for Contract no.
HK/2009/01
March 2012 |
April 2012 |
May 2012 |
Marine Works Dredging
works within HKCEC water Channel form CH190 to Ch260 for Type 2 sediment Dredging
works within HKCEC Water Channel from CH190 to CH260 for Type 3 sediment     Installation
of sheet pile for cooling water intake at Dome Promenade between CH120 and
CH170 Seawall
reinstatement and retaining wall construction at Wan Chai Lanfill in Zone
B1-3 Preparation
works for demolition of existing seawall at Cross-harbour Watermains Installation Installation
of cross-harbour watermains nos. A16/B16 Rockfilling
and rock protection for cross-harbour watermains Grouting
works at TST seafront along the pipe pile wall Trench
excavation and installation of shoring system along the pipe pile wall at TST
seafront Dredging
works in confined water by 9 in 1 barge Fresh Watermains, Cooling
Watermains and Salt Watermains (On Land) Mainlaying
works at Zone B1-3, B1-6, B4-4, B5-3, A1-1, A2-3C1, A3-3, A3-4B, A3-5B and
A4-2A Mainlaying
works and subsequent carriageway reinstatement in Zone A2-2 and A1-5A Mainlaying
at Zone A3-4B Diversion of
unferground cables at footpath of Mainlaying
Works at Zone A2-3C1 and subsequent road reinstatement work Cable
ducting works along Cable
ducting works along Cable
ducting works along Heading No.
H7 and H8 (mainlaying woks by trenchless method)  /span>Mainlaying and chamber construction works at
the traffic island near junction of Trench excavation,
pipe layig works and chamber construction for a 1000 dia. watermains (CHF) at
Trench
excavation, pipe laying works and chamber construction for a 1000 dia.
watermains (CHE) at
Pipe installation by trenchless method across the
EVA near |
Marine Works Dredging
works within HKCEC Water Channel from CH190 to CH250 for Type 2 sediment Installation
of sheet pile water channel for cooling water intake at Dome Promenade between
CH170 and CH260 Rockfilling
for rock bund at HKCEC Water Channel from CH220 to Ch230 Reclamation
of HKCEC3W within HKCEC Water Channel Seawall
reinstatement at Wan Chai Landfall in Zone B1-3 Preparation
works for demolition of existing seawall at Cross-Harbour Watermains Installation (CHA & CHB) and Marine Works (at TST) Installation
of cross-harbour watermains nos. A17/B17 Rockfilling
and rock protection to cross-harbour watermains Trench
excavation, installation of shoring system and trimming obstructions
(mini-piles) for a 1000 dia. Cross Harbour Watermains (CHB) along the pipe
pile wall at TST seashore Trench
excavation and installation of shoring system for a 1000 dia. Cross Harbour Watermains
(CHA) along the pipe pile wall at TST seashore Fresh Watermains, Cooling Watermains and Salt Watermains (On Land) Mainlaying
works at Zone B1-6, B4-3, B4-4, B5-1B, B5-3, A1-1, A2-2, A3-3, A3-4B, A3-5B,
A4-1 and A4-2A Mainlaying
works and subsequent reinstatement in Zone B1-3 Mainlaying
works at Zone B4-3 and Zone A2-2 Road
modification works (set back road kerb of central divider) at Mainlaying
works and subsequent carriageway reinstatement in Zone A2-3C1 and A1- 4A Diversion of
underground cables at footpath of Cable
ducting works along Heading No.
H7 (Mainlaying works by trenchless method) Mainlaying
Works at Heading No. 8 and Zone A1-5A1 Mainlaying
and chamber construction works at the traffic island near junction of Pipe
installation of a 1000 dia. Watermains (CHF) by trenchless method across the EVA near Pipe
installation of a 1000 dia. Watermains (CHE) by trenchless method across the EVA near |
Marine Works Installation
of sheet pile water channel for cooling water intake at Dome Promenade between
CH170 and CH240  Rockfilling
for rock bund at HKCEC Water Channel from Ch220 to Ch230 Reclamation
of HKCEC3W within HKCEC Water Channel was resumed. Rock armour
protection to the seawall at Wan Chai Landfall in Zone B1-3 was currently in
progress. Dredging
from CH290 to CH410 (Stage 3) near Preparation
works for demolition of existing seawall at Cross-Harbour Watermains Installation (CHA & CHB) Concrete
coating at flange joint of cross-harbour watermains nos. A13B13/A14B14, A14B14/A15B15
and A15B15/A16B16 Rockfilling
and rock protection to cross-harbour watermains. Trench
excavation, installation of shoring system and trimming obstructions
(mini-piles) for a 1000 dia. cross harbour watermains (CHB) along the pipe
pile wall at TST seashore Trench
excavation and installation of shoring system for a 1000 dia. Cross Harbour Watermains
(CHA) along the pipe pile wall at TST seashore Removal of
existing seawall at TST seashore for installation of cross harbour watermains
(CHA) Fresh Watermains, Cooling Watermains and Salt Watermains (On Land) Mainlaying
works at Zone B1-5A, B2-1, B4-3, B4-4, B5-1A, A1-1, A1-3, A1-3A, A1-3B, A2-2,
A3-3, A3-4B, A3-5B, A4-1 and A4-2A Mainlaying
works and subsequent carriageway reinstatement in Zone B1-6 and Zone A1-5A1 Mainlaying
works at Zone B1-5A and B2-1 Mainlaying
works at Zone A1-3 and excavation for jacking pit at Zone A1-3B Trench
excavation for cable & G.I. Ducting works at Zone B5-1A Gate valves
connection works for intake and discharge cooling mains of APA at Zone A2-2 Gate valves
connection works for intake cooling mains of Government‟s Offices at
Zone A4-1 Diversion of
underground cables at footpath of Heading No.
H7 (Mainlaying works by trenchless method). Excavation
for jacking pit for pipe laying works by heading method along Heading No.
8 Mainlaying
and chamber construction works at the traffic island near junction of Cable
ducting works along Cable
ducting works along Cable ducting
works at Trench
excavation, pipe laying works and chamber construction for a 1000 dia. Watermains
(CHF) at Trench
excavation, pipe laying woks and chamber construction for a 1000 dia. Watermains
CHE) at Pipe
installation of a 1000 dia. Watermains (CHE) by trenchless method across the EVA
near |
Table III    Principle Work Activities for Contract no.
HK/2009/02
March 2012 |
April 2012 |
May 2012 |
300mm thick
topping slab at southern portion and helipad slab Lighting installation
at Helipad Panel of
Safety Net at Helipad Hydraulics
pipe and hydraulics pump installation ABWFs and
E&M works of Passenger Terminal Building (PTB) Installation
of glass wall at PTB Drilling
hole of holding down bolt on existing pier deck at Noise Barrier NB2 Concreting
the footing of Noise Barrier NB1 Concreting the
drain pipe (150mm dia.) from manhole N7.3 to N1.2 and manhole N7.3 wall stem
and top slab of EVA at Breaking up
the cover walkway footing of EVA at E&M
works of P7, P8 & P9 -0.85mPD
steel platform of P7, P8 & P9 installation +1.35mPD and
-0.85mPD steel platform substantially completed at P7, P8 & P9 and
handover to E & M Team for next stage of work. Wet Well
penstock installation substantially was ongoing at P7, P8 & P9 and
commences to install the traveling band screen. 36 concrete
pipes of DSD pipe jacking drive in TBM Annulus
chemical grout surrounding the steel sleeve Excavation
and lateral support of the Jacking pit at ex-pet garden for the cooling mains
construction across HHR. Approximate
60m cooling water pipe was laid at Harbour Centre, Approximate
15m cable duct was laid at Casting of
slab above HEC room @ +9.17mPD for the WSD Salt Water Pumping Station. Excavation
for installation of 3rd layer (-1.5mPD) struts & wailings for shoring
system of 610 pipe pile wall landside cofferdam of salt water intake culvert. Excavation
for installation of 2nd layer (+0.5mPD) struts & wailings for shoring
system of salt water intake culvert Seaside Cofferdam. Dismantle of
temporary water tank at Portion 1A was in progress. Installation of temporary
water tank for construction of pile caps & beams at Portion 1A. Fabrication
of temporary water tank at Portion 2A & 2B formwork and re-bars fixing
for lower portion caps and beams at Portion 1A of New Ferry Pier. Installation
of temporary water tank for construction of pile caps & beams at Portion 2B. Welding of steel
supports at Portion 2C of the New Ferry Pier.   Backfilling on
the HDPE pipelines at diffuser section between CH0 & CH150 Excavation
for installation of 3rd layer (-2.0mPD) struts & wailings for shoring
system of Submarine Outfall Seaside Cofferdam Installation
of Temporary Decking Platform "C" |
300mm thick
topping slab T&C of
Foam system at Helipad T&C of
Safety net panel installation at Helipad ABWF and
E&M final fixing of Passenger Terminal Building (PTB) Lighting system
at Helipad Louvers and
touch up works of steel columns of Noise Barrier 1 & Noise Barrier 2 Placing of
paving block along EVA GFS handover
and Fire services inspection E&M
installation works of P7, P8 & P9 Respectively
as of 20 April 2012. Self-testing of the individual systems -0.85mPD
steel platform of P7 and the installation at P8 & P9 Wet Well
penstock installation at P7, P8 & P9 and install the traveling band
screen The TBM
retrieval of the DSD 2nd drive Approximate
65m cooling water pipe was laid at Harbour Centre, Combined
chamber for SHK at ex-pet garden Approximate
8m cable duct was laid at Heading
construction at ex-pet garden was completed for the cooling mains
installation across ABWFs and
E&M installation at the TX room of the WSD Salt Water Pumping Station Installation
and welding for 3rd layer of walings and struts for construction of intake Sand
backfilling works and dewatering at Wan Shing Street Bay 24 ELS of 3rd
layer (-1.5mPD) struts & walings of salt water intake landside cofferdam ELS of 2nd
layer (+0.5mPD) struts & walings of salt water intake seaside cofferdam ELS of 3rd
layer (-2.0mPD) struts & walings of Submarine Outfall Seaside Cofferdam
was in progress. Portion 1A  
upper caps & beams construction Portion 2A  
2A3 & 2A2 upper caps and beams formwork Portion 2B  
2B3 & 2B2 upper caps and beams formwork Portion 2C Portion 3C  
3C1 & 3C2 water tank installed sealing and 3C3 is under fabrication Backfilling on
the HDPE pipelines at diffuser section between CH0 & CH150 Approximate
8m DN800 MS pipe installation near Gate 1 at ex-pet garden Trial
dredging works of WCR2 Piping
diversion at WCR2 Pre-bored
H-piles construction at Box Culvert O and divert HHR traffic to small pet
garden Installation
of precast beam, central beam and excavation works at Box Culvert O |
Remaining
works along EVA E&M
installation works of P7, P8 & P9 Concreting
of thrust blocks in P8 dry well Install the
motor of the band screen at wet well of P8 was ongoing and P9 The TBM
breaking-in of the WSD 2nd drive Approximate
35m cooling water pipe was laid at Harbour Centre, Combined
chamber for SHK at ex-pet garden Approximate
10m cable duct was laid at Casting of
final slab at +15.71 mPD for the WSD Salt Water Pumping Station. HEC Switch
Room of the WSD Salt Water Pumping Station ABWFs and
E&M installation at the TX room of the WSD Salt Water Pumping Station Installation
and welding for 4th layer of wailings and struts for construction of intake Dewatering
at Wan Shing Street Bay 24 for opening in sheetpile cofferdam ELS of 3rd
layer (-1.5mPD) struts & wailings of salt water intake landside cofferdam
ELS of 2nd
layer (+0.5mPD) struts & wailings of salt water intake seaside cofferdam Remedial
works of hole drilling for grouting to avoid seepage outside the salt water
intake seaside cofferdam ELS of 3rd
layer (-2.0mPD) struts & wailings of Submarine Outfall Seaside Cofferdam Removal of
formwork for slab and beam high portion 1A Concreting
of pile cap low portion 2A1, sloping tie beam, tie beam between 2A1 to 2A2
and 2A1 to 1A Concreting
of slab and beam high portion 2A3, 2B1 and 2B2 (+3.15mPD to +3.75mPD) at
Ferry Pier Removal of
formwork of slab and beam high portion 2B1, 2B2 and 2B3 (+4.15mPD) Erection of
formwork for pile cap low portion 3B at Ferry Pier Dewatering
and fixing of steel water tank for construction of pile cap at portion 3A and
3C2 at Ferry Pier              
Approximate
5m DN800 MS pipe installation near Gate 1 at ex-pet garden Piping
diversion at WCR2 Excavation
works and utilities diversion at Box Culvert O
Permanent precast beam and central beam for Box
Culvert O diversion |
Table IV   Principle Work
Activities for Contract no. HY/2009/15
March 2012 |
April 2012 |
May 2012 |
Reclamation
works at TS4/ME4 Diaphragm
wall construction preparation works at TS4 Marine SI at
TS2 ELS works at
TS1 and TPCWAE Night time
protection works at CHT Cut off wall
preparation works at |
Dredging for
seawall foundation at TS2 |
Dredging for
seawall foundation at TS2 |
Table V    Principle Work
Activities for Contract no. HK/2010/06
March 2012 |
April 2012 |
May 2012 |
Excavation
of bored piles Concreting
of bored piles Coring Works Sheet Piles Construction
of Pre-cast Unit in |
Excavation
of bored piles Concreting
of bored piles Coring Works Sheet Piles Construction
of Pre-cast Unit in |
Excavation
of bored piles Concreting
of bored piles Coring Works Sheet Piles Construction
of Pre-cast Unit in |
Table VI   Principle Work
Activities for Contract no. HY/2009/19
March 2012 |
April 2012 |
May 2012 |
Marine bored
piling |
Marine bored
piling |
Marine bored
piling |
Noise Monitoring
M4b: From 17 Apr 2012 to 20 Apr 2012
M5b: From 17 Apr 2012 to 20 Apr 2012
M6:  From 17
Apr 2012 to 20 Apr 2012
Real-time Noise Monitoring
Air Quality Monitoring
CMA1b: from 13 Mar 2012 to 14 Mar 2012
       
from 8 May 2012 to 9 May 2012
CMA3a: from 24 Mar 2012 to 26 Mar 2012
       
from 16 and 20 Apr 2012 to 17 and 24 Apr 2012
CMA5a: from 8 May and 25 May 2012 to 9 May 2012 and
26 May 2012
CMA6a: from 20 Apr 2012 to 21 Apr 2012
       
from 8 May and 25 May 2012 to 9 May 2012 and 26 May 2012
Water Quality Monitoring
ebb tide water monitoring on 16,
20 and 27 April 2012 were cancelled.
Complaints, Notifications of
Summons and Successful Prosecutions
1.1.1.
Lam
Geotechnics Limited (LGL) has been appointed to work as the Environmental Team
(ET) under Environmental Permit no. EP-356/2009 and Further Environmental
permit nos. FEP-01/356/2009, FEP-02/356/2009, FEP-03/356/2009, FEP-04/356/2009 and FEP-05/356/2009 to implement the Environmental Monitoring and
Audit (EM&A) programme as stipulated in the EM&A Manual of the approved
Environmental Impact Assessment (EIA) Report for Wan Chai Development phase II
and Central-Wan Chai Bypass (Register No.: AEIAR-125/2008) and in the EM&A
Manual of the approved EIA Report for Central-Wan Chai Bypass and Island
Eastern Corridor Link (Register No. AEIAR-014/2001).
1.1.2.
This
report presents the environmental monitoring and auditing work carried out in
accordance to the Section 10.4 of EM&A Manual and  /span>Environmental
Monitoring and Audit Requirements /span> under Particular
Specification Section 27.
1.1.3.
This report documents the finding of EM&A works
during the period from March 2012 to May 2012
Section 1     Introduction  details the scope and structure of the
report.
Section 2     Project Background  summarizes
background and scope of the project, site description, project organization and
contact details of key personnel during the reporting period.
Section 3     Monitoring Requirements  summarizes all monitoring parameters,
monitoring locations, monitoring frequency, duration and action plan.
Section 4     Monitoring Results  summarizes the
monitoring results obtained in the reporting period.
Section 5     Compliance Audit  summarizes the auditing of
monitoring results, all exceedances environmental parameters.
Section 6     Complaints, Notification of summons and
Prosecution  summarizes the cumulative statistics on complaints,
notification of summons and prosecution
Section 7     Cumulative Construction Impact due to the
Concurrent Projects  summarizes the relevant cumulative
construction impact due to the concurrent activities of the concurrent Projects.
Section 8     Conclusion
2.1.1.
“Wan
Chai Development phase II and Central-Wan Chai Bypass and “Central-Wan Chai
Bypass and Island Eastern Corridor Link (hereafter called “the Project  are
Designed Project (DP) under the Environmental Impact Assessment Ordinance (Cap.
499) (EIAO). The Environmental Impact
Assessment (EIA) Reports for Central-Wan Chai Bypass and
2.1.2.
The
key purpose of Wan Chai Development Phase II (WDII) is to provide land at Wan
Chai North and North Point for construction of the Central-Wan Chai Bypass and
Island Eastern Corridor Link (CWB). Land formed under the project will be
developed as a world-class waterfront promenade joining that at the new Central
waterfront for public enjoyment.
2.1.3.
There
is a compelling and present need for the CWB to provide relief to the very congested
2.2.1.
The
Project is located mainly in Wan Chai North,
2.2.2.
The
study area encompasses existing developments along the Wan Chai,
2.2.3.
The scope of the Project comprises:
 -
Land formation for key transport infrastructure and
facilities, including the Trunk Road (i.e. CWB) and the associated slip roads for
connection to the Trunk Road and for through traffic from Central to Wan Chai and
Causeway Bay. The land formed for the above transport infrastructure will provide
opportunities for the development of an attractive waterfront promenade for the
enjoyment of the public
 -
Reprovisioning / protection of the existing
facilities and structures affected by the land formation works mentioned above
 -
Extension, modification, reprovisioning or
protection of existing storm water drainage outfalls, sewerage outfalls and
watermains affected by the revised land use and land formation works mentioned
above
 -
Upgrading of hinterland storm water drainage system
and sewerage system, which would be rendered insufficient by the land formation
works mentioned above
 -
Provision of the ground level roads, flyovers,
footbridges, necessary transport facilities and the associated utility services
 -
Construction of the new waterfront promenade,
landscape works and the associated utility services
 -
The Trunk Road (i.e. CWB) within the study area and
the associated slip roads for connection to the Trunk Road.
2.2.4.
The
project also contains various Schedule 2 DPs that, under the EIAO, require
Environmental Permits (EPs) to be granted by the DEP before they may be either
constructed or operated. Table 2.1 summarises the five
individual DPs under this Project.
Figure 2.1 shows the locations of these Schedule 2 DPs.
Table
2.1   Schedule 2 Designated Projects
under this Project
Item |
Designated Project |
EIAO Reference |
Reason for inclusion |
DP1 |
Central-Wanchai Bypass (CWB) including its road tunnel and slip roads |
Schedule 2, Part I, A.1 and A.7 |
Trunk road and road tunnel more than 800 m in length |
DP2 |
Road P2 and other roads which are classified as primary/district
distributor roads |
Schedule 2, Part I, A.1 |
Primary / district distributor roads |
DP3 |
Reclamation works including associated dredging works |
Schedule 2, Part I, C.1 and C.12 |
Reclamation more than 5 ha in size and a dredging operation less than
100 m from a seawater intake point |
DP5 |
Wan Chai East Sewage Outfall |
Schedule 2, Part I, F.5 and F.6 |
Submarine sewage pipelines with a total diameter more than 1,200 mm
and include a submarine sewage outfall |
DP6 |
Dredging for the Cross-harbour Water Mains from Wan Chai to Tsim Sha
Tsui |
Schedule 2, Part I, C.12 |
A dredging operation less than 100 m from a seawater intake point |
2.3.1.
Due
to the multi-contract nature of the Project, there are a number of contracts
sub-dividing the whole works area into different work areas to be
commenced. Contractors of individual
contracts will be required by the EP holder to apply Further Environmental
Permits (FEP) such that the impact monitoring stations are sub-divided
accordingly to facilitate the implementation of EM&A programme and to
streamline the EM&A reporting for individual FEP holders correspondingly.
2.3.2.
The
details of individual contracts are summarized in Table2.2.
Table
2.2  Details of Individual Contracts
under the Project
Contract
No. |
Contract Title |
Associated
DP(s) |
Construction
Commencement Date |
HK/2009/01 |
Wan Chai Development Phase II  Central –Wanchai Bypass at |
DP3, DP6 |
23 July 2010 |
DP1, DP2 |
25 August 2011 |
||
HK/2009/02 |
Wan Chai Development Phase II  Central  Wan Chai Bypass at WanChai
East |
DP3, DP5 |
5 July 2010 |
DP1 |
26 April 2011 |
||
HY/2009/11 |
Wan Chai Development Phase II and Central  Wan Chai Bypass  North
Point Reclamation |
DP3 |
17 March 2010 (Under applicationof surrender) |
HY/2009/15 |
Central-Wanchai Bypass  Tunnel ( |
DP3 |
10 November 2010 |
DP1 |
13 July 2011 |
||
HK/2010/06 |
Wan Chai Development Phase II-Central-Wan Chai Bypass over MTR Tsuen
Wan Line |
DP3 |
22 March 2011 |
04/HY/2006 |
Reconstruction of Bus Terminus near |
DP1 |
September 2010 |
HY/2009/17 |
Central - Wan Chai Bypass (CWB) at FEHD Whitfield Depot - Advanced
piling works. |
DP1 |
5 October 2010 |
HY/2009/18 |
Central - Wan Chai Bypass (CWB)  Central Interchange |
DP1 |
21 April 2011 |
HY/2009/19 |
Central - Wanchai Bypass Tunnel (North Point Section) and Island
Eastern Corridor Link |
DP1 |
24 March 2011 |
2.4.1.
Civil Engineering and Development Department and
Highways Department are the overall project controllers for the Wan Chai
Development Phase II and Central-Wan Chai Bypass respectively. For
the construction phase of the Project, Project Engineer, Contractor(s),
Environmental Team and Independent Environmental Checker are appointed to
manage and control environmental issues.
2.4.2.
The
proposed project organization and lines of communication with respect to
environmental protection works are shown in
Figure 2.2. Key
personnel and contact particulars are summarized in Table 2.3:
Table 2.3  Contact Details of Key Personnel
Party |
Role |
Post |
Name |
Contact No. |
Contact Fax |
AECOM |
Engineer’s Representative  /span>for
WDII |
Principal Resident Engineer |
Mr. Frankie Fan |
2587 1778 |
2587 1877 |
Engineer’s Representative  /span>for CWB |
Principal Resident Engineer |
Mr. Peter Poon |
3916 1818 |
3529 2829 |
|
|
Contractor under Contract no. HY/2009/11 |
Project Director |
Mr. Cho Yu Fun |
3157 1086 |
3157 1085 |
Project
Manager |
Mr. Gregory Wong |
3157 1086 |
|||
Site Agent |
Mr. Daniel Cheung |
3157 1086 |
|||
Environmental
Officer |
Mr. C. M. Wong |
3157 1086 |
|||
Chun Wo  Leader Joint Venture |
Contractor under Contract no. HK/2009/01 |
Project Director |
|
9124 2471 |
2634 1626 |
Site Agent |
Mr. Paul Yu |
9456 9819 |
|||
Operation
Manager |
Mr. Lau Yee Ching |
9466 3918 |
|||
Construction
Manager |
Mr. Wyman
Wong |
9627 2467 |
|||
Construction
Manager |
Mr. Jack Chu |
9775 3008 |
|||
Construction
Manager |
Mr. KK Yuen Mr. Andy Yu |
9498 1213 96484896 |
|||
Environmental
Officer (Compliance Manager) |
Mr. Andy Mak
|
9103 2370 |
|||
Chun Wo  CRGL Joint Venture |
Contractor under Contract no. HK/2009/02 |
Site Agent |
Mr. Chan Sing Cho |
3658 3002 |
2827 9996 |
Quality & Environmental Manager |
Mr. C.P. Ho |
3658 3000 |
|||
Environmental Officer |
Ms. Flora Ng |
3658 3064 |
|||
|
Contractor under Contract no. HY/2009/15 |
Project Director |
Chan Wai Hung |
2823 7813 |
2865 5229 |
Site Manager |
P J Fan |
3557 6368 |
2566 2192 |
||
|
|
Contractor’s Representative |
Mr. David Lau |
3557 6368 |
2566 2192 |
|
|
Head of Construction Manager |
Roger Cheung |
3557 6371 |
2566 2192 |
|
|
Senior Construction Manager |
Gene Cheung |
3557 6395 |
2566 2192 |
Environmental Officer |
Mr. Daniel Sin |
3557 6215 |
|
||
Gammon -Leader JV Chun Wo - CRGL - MBEC Joint Venture |
Contractor under Contract no. HK/2010/06 Contractor under Contract no. HY/2009/19 |
Project
Manager |
Mr. Paul Lui |
9095 7922 |
2529 2880 2570 8013 |
Site Agent |
Mr. Keith Tse |
2529 2068 |
|||
Environmental
Officer |
Mr. Lee Wai Man |
9481 6024 |
|||
Project Manager |
Mr. Rayland Lee |
3758 8879 |
|||
Site Agent |
Mr. Cheung Kit Cheung |
6909 1555 |
|||
Environmental
Engineer |
Mr. Simon Wong |
9281 4346 |
|||
Environmental Manager / Environmental
Officer |
Mr. M.H. Isa |
9884 0810 |
|
||
Construction Manager (Marine) |
William Luk |
9610 1101 |
|
||
Construction Manager (Land) |
Patrick Cheung |
9643 3012 |
|
||
ENVIRON Hong Kong Limited |
Independent
Environmental Checker (IEC) |
Independent Environmental Checker (IEC) |
Mr. David Yeung |
3743 0788 |
3548 6988 |
Lam Geotechnics Limited |
Environmental
Team (ET) |
Environmental Team Leader (ETL) |
Mr. Raymond Dai |
2882 3939 |
2882 3331 |
2.5.1.
During
this reporting period, the principle work activities for Contract no.
HY/2009/11 are summarized in Table2.4.
Table
2.4   Principle Work Activities for
Contract no. HY/2009/11
March 2012 |
April 2012 |
May 2012 |
The major
work activities for Contract no. HY/2009/11 was confirmed substantial complete
by RSS on 4 January 2012. The construction site was handed over to contractor
HY/2009/19 and the FEP-01/356/2009 was under application of surrender in this
reporting period. |
The major
work activities for Contract no. HY/2009/11 was confirmed substantial complete
by RSS on 4 January 2012. The construction site was handed over to contractor
HY/2009/19 and the FEP-01/356/2009 was under application of surrender in this
reporting period. |
Rectifications
of rock armour at Portion III The major
work activities for Contract no. HY/2009/11 was confirmed substantial complete
by RSS on 4 January 2012. The construction site was handed over to contractor
HY/2009/19 and the FEP-01/356/2009 was under application of surrender in this
reporting period. |
2.5.2.
During
this reporting period, the principle work activities for Contract no.
HK/2009/01 are summarized in Table 2.5.
Table
2.5   Principle Work Activities for
Contract no. HK/2009/01
March 2012 |
April 2012 |
May 2012 |
Marine Works Dredging
works within HKCEC water Channel form CH190 to Ch260 for Type 2 sediment Dredging
works within HKCEC Water Channel from CH190 to CH260 for Type 3 sediment     Installation
of sheet pile for cooling water intake at Dome Promenade between CH120 and
CH170 Seawall
reinstatement and retaining wall construction at Wan Chai Lanfill in Zone
B1-3 Preparation
works for demolition of existing seawall at Cross-harbour Watermains
Installation Installation
of cross-harbour watermains nos. A16/B16 Rockfilling
and rock protection for cross-harbour watermains Grouting
works at TST seafront along the pipe pile wall Trench
excavation and installation of shoring system along the pipe pile wall at TST
seafront Dredging
works in confined water by 9 in 1 barge Fresh
Watermains, Cooling Watermains and Salt Watermains (On Land) Mainlaying
works at Zone B1-3, B1-6, B4-4, B5-3, A1-1, A2-3C1, A3-3, A3-4B, A3-5B and
A4-2A Mainlaying
works and subsequent carriageway reinstatement in Zone A2-2 and A1-5A Mainlaying
at Zone A3-4B Diversion of
unferground cables at footpath of Mainlaying
Works at Zone A2-3C1 and subsequent road reinstatement work Cable
ducting works along Cable
ducting works along Cable
ducting works along Heading No.
H7 and H8 (mainlaying woks by trenchless method)  /span>Mainlaying and chamber construction works at
the traffic island near junction of Trench excavation,
pipe layig works and chamber construction for a 1000 dia. watermains (CHF) at
Trench
excavation, pipe laying works and chamber construction for a 1000 dia.
watermains (CHE) at
Pipe installation by trenchless method across the
EVA near |
Marine Works Dredging
works within HKCEC Water Channel from CH190 to CH250 for Type 2 sediment Installation
of sheet pile water channel for cooling water intake at Dome Promenade between
CH170 and CH260 Rockfilling
for rock bund at HKCEC Water Channel from CH220 to Ch230 Reclamation
of HKCEC3W within HKCEC Water Channel Seawall reinstatement
at Wan Chai Landfall in Zone B1-3 Preparation
works for demolition of existing seawall at Cross-Harbour Watermains Installation (CHA &
CHB) and Marine Works (at TST) Installation
of cross-harbour watermains nos. A17/B17 Rockfilling
and rock protection to cross-harbour watermains Trench
excavation, installation of shoring system and trimming obstructions
(mini-piles) for a 1000 dia. Cross Harbour Watermains (CHB) along the pipe
pile wall at TST seashore Trench
excavation and installation of shoring system for a 1000 dia. Cross Harbour Watermains
(CHA) along the pipe pile wall at TST seashore Fresh Watermains, Cooling Watermains and Salt Watermains
(On Land) Mainlaying
works at Zone B1-6, B4-3, B4-4, B5-1B, B5-3, A1-1, A2-2, A3-3, A3-4B, A3-5B,
A4-1 and A4-2A Mainlaying
works and subsequent reinstatement in Zone B1-3 Mainlaying
works at Zone B4-3 and Zone A2-2 Road
modification works (set back road kerb of central divider) at Mainlaying
works and subsequent carriageway reinstatement in Zone A2-3C1 and A1- 4A Diversion of
underground cables at footpath of Cable
ducting works along Heading No.
H7 (Mainlaying works by trenchless method) Mainlaying
Works at Heading No. 8 and Zone A1-5A1 Mainlaying
and chamber construction works at the traffic island near junction of Pipe
installation of a 1000 dia. Watermains (CHF) by trenchless method across the EVA near Pipe
installation of a 1000 dia. Watermains (CHE) by trenchless method across the EVA near |
Marine Works Installation
of sheet pile water channel for cooling water intake at Dome Promenade between
CH170 and CH240 Rockfilling
for rock bund at HKCEC Water Channel from Ch220 to Ch230 Reclamation
of HKCEC3W within HKCEC Water Channel Rock armour
protection to the seawall at Wan Chai Landfall in Zone B1-3 Dredging
from CH290 to CH410 (Stage 3) near Preparation
works for demolition of existing seawall at Cross-Harbour Watermains Installation (CHA &
CHB) Concrete
coating at flange joint of cross-harbour watermains nos. A13B13/A14B14, A14B14/A15B15
and A15B15/A16B16 Rockfilling
and rock protection to cross-harbour watermains Trench excavation,
installation of shoring system and trimming obstructions (mini-piles) for a
1000 dia. cross harbour watermains (CHB) along the pipe pile wall at TST seashore
Trench
excavation and installation of shoring system for a 1000 dia. Cross Harbour Watermains
(CHA) along the pipe pile wall at TST seashore Removal of
existing seawall at TST seashore for installation of cross harbour watermains
(CHA) Fresh Watermains, Cooling Watermains and Salt Watermains
(On Land) Mainlaying
works at Zone B1-5A, B2-1, B4-3, B4-4, B5-1A, A1-1, A1-3, A1-3A, A1-3B, A2-2,
A3-3, A3-4B, A3-5B, A4-1 and A4-2A Mainlaying
works and subsequent carriageway reinstatement in Zone B1-6 and Zone A1-5A1 Mainlaying
works at Zone B1-5A and B2-1 Mainlaying
works at Zone A1-3 and excavation for jacking pit at Zone A1-3B Trench
excavation for cable & G.I. Ducting works at Zone B5-1A Gate valves
connection works for intake and discharge cooling mains of APA at Zone A2-2 Gate valves
connection works for intake cooling mains of Government‟s Offices at Zone A4-1 Diversion of
underground cables at footpath of Heading No.
H7 (Mainlaying works by trenchless method) Excavation
for jacking pit for pipe laying works by heading method along Heading No.
H6A and No. 8 Mainlaying
and chamber construction works at the traffic island near junction of Cable
ducting works along Cable
ducting works along Cable
ducting works at Trench
excavation, pipe laying works and chamber construction for a 1000 dia. Watermains
(CHF) at Trench
excavation, pipe laying woks and chamber construction for a 1000 dia. Watermains
CHE) at Pipe installation
of a 1000 dia. Watermains (CHE) by trenchless method across the EVA near |
2.5.3.
During
this reporting period, the principle work activities for Contract no.
HK/2009/02 are summarized in Table 2.6.
Table
2.6   Principle Work Activities for
Contract no. HK/2009/02
March 2012 |
April 2012 |
May 2012 |
300mm thick
topping slab at southern portion and helipad slab Lighting installation
at Helipad Panel of
Safety Net at Helipad Hydraulics
pipe and hydraulics pump installation ABWFs and
E&M works of Passenger Terminal Building (PTB) Installation
of glass wall at PTB Drilling
hole of holding down bolt on existing pier deck at Noise Barrier NB2 Concreting
the footing of Noise Barrier NB1 Concreting the
drain pipe (150mm dia.) from manhole N7.3 to N1.2 and manhole N7.3 wall stem
and top slab of EVA at Breaking up
the cover walkway footing of EVA at E&M
works of P7, P8 & P9 -0.85mPD
steel platform of P7, P8 & P9 installation +1.35mPD and
-0.85mPD steel platform substantially completed at P7, P8 & P9 and
handover to E & M Team for next stage of work. Wet Well
penstock installation substantially was ongoing at P7, P8 & P9 and
commences to install the traveling band screen. 36 concrete
pipes of DSD pipe jacking drive in TBM Annulus
chemical grout surrounding the steel sleeve Excavation
and lateral support of the Jacking pit at ex-pet garden for the cooling mains
construction across HHR. Approximate
60m cooling water pipe was laid at Harbour Centre, Approximate
15m cable duct was laid at Casting of
slab above HEC room @ +9.17mPD for the WSD Salt Water Pumping Station. Excavation
for installation of 3rd layer (-1.5mPD) struts & wailings for shoring
system of 610 pipe pile wall landside cofferdam of salt water intake culvert. Excavation
for installation of 2nd layer (+0.5mPD) struts & wailings for shoring
system of salt water intake culvert Seaside Cofferdam. Dismantle of
temporary water tank at Portion 1A was in progress. Installation of temporary
water tank for construction of pile caps & beams at Portion 1A. Fabrication
of temporary water tank at Portion 2A & 2B formwork and re-bars fixing
for lower portion caps and beams at Portion 1A of New Ferry Pier. Installation
of temporary water tank for construction of pile caps & beams at Portion 2B. Welding of steel
supports at Portion 2C of the New Ferry Pier.   Backfilling on
the HDPE pipelines at diffuser section between CH0 & CH150 Excavation
for installation of 3rd layer (-2.0mPD) struts & wailings for shoring
system of Submarine Outfall Seaside Cofferdam Installation
of Temporary Decking Platform "C" |
300mm thick
topping slab T&C of
Foam system at Helipad T&C of
Safety net panel installation at Helipad ABWF and
E&M final fixing of Passenger Terminal Building (PTB) Lighting system
at Helipad Louvers and
touch up works of steel columns of Noise Barrier 1 & Noise Barrier 2 Placing of
paving block along EVA GFS handover
and Fire services inspection E&M
installation works of P7, P8 & P9 Respectively
as of 20 April 2012. Self-testing of the individual systems -0.85mPD
steel platform of P7 and the installation at P8 & P9 Wet Well
penstock installation at P7, P8 & P9 and install the traveling band screen
The TBM
retrieval of the DSD 2nd drive Approximate
65m cooling water pipe was laid at Harbour Centre, Combined
chamber for SHK at ex-pet garden Approximate
8m cable duct was laid at Heading
construction at ex-pet garden was completed for the cooling mains
installation across ABWFs and
E&M installation at the TX room of the WSD Salt Water Pumping Station Installation
and welding for 3rd layer of walings and struts for construction of intake Sand
backfilling works and dewatering at Wan Shing Street Bay 24 ELS of 3rd
layer (-1.5mPD) struts & walings of salt water intake landside cofferdam ELS of 2nd
layer (+0.5mPD) struts & walings of salt water intake seaside cofferdam ELS of 3rd
layer (-2.0mPD) struts & walings of Submarine Outfall Seaside Cofferdam
was in progress. Portion 1A  
upper caps & beams construction Portion 2A  
2A3 & 2A2 upper caps and beams formwork Portion 2B  
2B3 & 2B2 upper caps and beams formwork Portion 2C Portion 3C  
3C1 & 3C2 water tank installed sealing and 3C3 is under fabrication Backfilling on
the HDPE pipelines at diffuser section between CH0 & CH150 Approximate
8m DN800 MS pipe installation near Gate 1 at ex-pet garden Trial
dredging works of WCR2 Piping
diversion at WCR2 Pre-bored
H-piles construction at Box Culvert O and divert HHR traffic to small pet
garden Installation
of precast beam, central beam and excavation works at Box Culvert O |
Remaining
works along EVA E&M
installation works of P7, P8 & P9 Concreting
of thrust blocks in P8 dry well Install the
motor of the band screen at wet well of P8 was ongoing and P9 The TBM
breaking-in of the WSD 2nd drive Approximate
35m cooling water pipe was laid at Harbour Centre, Combined
chamber for SHK at ex-pet garden Approximate
10m cable duct was laid at Casting of
final slab at +15.71 mPD for the WSD Salt Water Pumping Station. HEC Switch
Room of the WSD Salt Water Pumping Station ABWFs and
E&M installation at the TX room of the WSD Salt Water Pumping Station Installation
and welding for 4th layer of wailings and struts for construction of intake Dewatering
at Wan Shing Street Bay 24 for opening in sheetpile cofferdam ELS of 3rd
layer (-1.5mPD) struts & wailings of salt water intake landside cofferdam
ELS of 2nd
layer (+0.5mPD) struts & wailings of salt water intake seaside cofferdam Remedial
works of hole drilling for grouting to avoid seepage outside the salt water
intake seaside cofferdam ELS of 3rd
layer (-2.0mPD) struts & wailings of Submarine Outfall Seaside Cofferdam Removal of
formwork for slab and beam high portion 1A Concreting
of pile cap low portion 2A1, sloping tie beam, tie beam between 2A1 to 2A2
and 2A1 to 1A Concreting
of slab and beam high portion 2A3, 2B1 and 2B2 (+3.15mPD to +3.75mPD) at
Ferry Pier Removal of
formwork of slab and beam high portion 2B1, 2B2 and 2B3 (+4.15mPD) Erection of
formwork for pile cap low portion 3B at Ferry Pier Dewatering
and fixing of steel water tank for construction of pile cap at portion 3A and
3C2 at Ferry Pier           Approximate
5m DN800 MS pipe installation near Gate 1 at ex-pet garden Piping
diversion at WCR2 Excavation
works and utilities diversion at Box Culvert O Permanent
precast beam and central beam for Box Culvert O diversion |
2.5.4.
Major construction activities for Contract no.
HY/2009/15 was commenced on 10 November 2010. During this reporting period, the
principle work activities for Contract no. HY/2009/15 are summarized as below:
Table
2.7   Principle Work Activities for Contract no. HY/2009/15
March 2012 |
April 2012 |
May 2012 |
Reclamation
works at TS4/ME4 Diaphragm
wall construction preparation works at TS4 Marine SI at
TS2 ELS works at
TS1 and TPCWAE Night time
protection works at CHT Cut off wall
preparation works at |
Dredging for
seawall foundation at TS2 |
Dredging for
seawall foundation at TS2 |
2.5.5.
Contract
no. HK/2010/06 was commenced on 22 March 2011. During this reporting period,
the principle work activities for Contract no. HK/2010/06 are summarized as
below:
Table
2.8   Principle Work Activities for Contract no. HK/2010/06
March 2012 |
April 2012 |
May 2012 |
Excavation
of bored piles Concreting
of bored piles Coring Works Sheet Piles Construction
of Pre-cast Unit in |
Excavation
of bored piles Concreting
of bored piles Coring Works Sheet Piles Construction
of Pre-cast Unit in |
Excavation
of bored piles Concreting
of bored piles Coring Works Sheet Piles Construction
of Pre-cast Unit in |
Table 2.9  Principle Work Activities
for Contract no. HY/2009/19
March 2012 |
April 2012 |
May 2012 |
Marine bored piling |
Marine bored piling |
Marine bored piling |
2.5.7.
Implementation
status of the recommended mitigation measures during this reporting period is
presented in
Appendix 2.1.
Noise Monitoring Stations
3.1.1.
The
noise monitoring stations for the Project are listed and shown in Table
3.1 and
Figure 3.1. Appendix 3.1 shows
the established Action/Limit Levels for the monitoring works.
Table 3.1  Noise Monitoring Stations
Station |
Description |
M1a |
Harbour Road Sports Centre |
M2b |
Noon Gun Area |
M3a |
Tung Lo Wan Fire
Station |
M4b |
Victoria Centre |
M5b |
|
M6 |
HK |
Real
time Noise Monitoring Stations
3.1.1.
The real-noise monitoring stations for the Project are
listed and shown in Table 3.2 and
Figure 3.1..
Appendix 3.1 shows the established Action/Limit Levels for the
monitoring works.
Table 3.2  Real Time Noise Monitoring Station
District |
Station |
Description |
Tin Hau |
RTN1 |
FEHD Hong Kong Transport Section Whitefield Depot |
North Point |
RTN2 |
Oil Street Community Liaison Centre |
Noise Monitoring
Parameters, Frequency and Duration
3.1.2.
The construction
noise level shall be measured in terms of the A-weighted equivalent continuous sound
pressure level (Leq). Leq (30 minutes) shall be used as
the monitoring parameter for the time period between 0700
and 1900 hours on normal weekdays. For all other time periods, Leq (5
minutes) shall be employed for comparison with the Noise Control
Ordinance (NCO) criteria.
Supplementary information for data auditing, statistical results such as L10
and L90 shall also be obtained for reference.
3.1.3.
Noise monitoring
shall be carried out at all the designated monitoring stations. The monitoring
frequency shall depend on the scale of the construction activities. The
following is an initial guide
on the regular monitoring frequency for each station on a weekly basis when
noise generating activities are underway:
 -
one
set of measurements between 0700 and 1900 hours on normal weekdays.
3.1.4.
If construction works are extended to
include works during the hours of 1900  0700 as well as public holidays and
Sundays, additional weekly impact monitoring shall be carried out during
respective restricted hours periods. Applicable permits under NCO shall be
obtained by the Contractor.
3.1.5.
Real
time noise shall be carried out at the designated monitoring stations. The
following is an initial guide on the regular monitoring frequency for each
station on a 24 hours daily basis when noise generating activities are
underway:
 -
One
set of measurements between 0700 and 1900 hours on normal weekdays.
 -
One
set of measurements between 1900 and 2300 hours on normal weekdays and 0700 and
2300 hours on public holidays.
 -
One
set of measurements between 2300 and 0700 hours on next day on everyday.
3.1.6.
Noise
baseline level review was commenced in this reporting period. Detailed review
report showed in
Appendix 3.2.
3.1.7.
Real
time noise baseline level review at night time period (2300 to 0700) was
commenced in this reporting period. Detailed review report showed in
Appendix 3.3.
Monitoring Equipment
3.1.8.
As referred to in the Technical Memorandum  issued
under the NCO, sound level meters in compliance with the International
Electrotechnical Commission Publications 651: 1979 (Type 1) and 804: 1985 (Type
1) specifications shall be used for carrying out the noise monitoring.
Immediately prior to and following each noise measurement the accuracy of the
sound level meter shall be checked using an acoustic calibrator generating a
known sound pressure level at a known frequency. Measurements may be accepted
as valid only if the calibration level from before and after the noise
measurement agree to within 1.0 dB.
3.1.9.
Noise measurements shall not be made in fog, rain,
wind with a steady speed exceeding 5 m/s or wind with gusts exceeding 10 m/s.
The wind speed shall be checked with a portable wind speed meter capable of
measuring the wind speed in m/s.
Air Quality Monitoring
Stations
3.2.1.
The
air monitoring stations for the Project are listed and shown in Table
3.3 and
Figure 3.1.
Appendix 3.1 shows the established
Action/Limit Levels for the monitoring works.
Table 3.3  Air Monitoring Stations
Station ID |
Monitoring
Location |
Description |
CMA1b |
Oil Street Community
Liaison Centre |
North Point |
CMA2a |
|
|
CMA3a |
CWB PRE Site Office * |
|
CMA4a |
Society for the
Prevention of Cruelty to Animals |
Wan Chai |
CMA5a |
Children Playgrounds
opposite to |
Wan Chai |
CMA6a |
WDII PRE Site Office * |
Wan Chai |
* Remarks: As per the ENPC meeting in January 2011,
the monitoring stations CMA3a - Future CWB site office at Wanchai Waterfront
Promenade and CMA6a - Future AECOM site office at Work Area were renamed as
remark.
Air Monitoring Parameters,
Frequency and Duration
3.2.2.
One-hour
and 24-hour TSP levels should be measured to indicate the impacts of
construction dust on air quality. The 24-hour TSP levels shall be measured by
following the standard high volume sampling method as set out in the Title 40
of the Code of Federal Regulations, Chapter 1 (Part 50), Appendix B.
3.2.3.
All
relevant data including temperature, pressure, weather conditions, elapsed-time
meter reading for the start and stop of the sampler, identification and weight
of the filter paper, and any other local atmospheric factors affecting or
affected by site conditions, etc., shall be recorded down in detail.
3.2.4.
For
regular impact monitoring, the sampling frequency of at least once in every six-days,
shall be strictly observed at all the monitoring stations for 24-hour TSP
monitoring. For 1-hour TSP monitoring, the sampling frequency of at least three
times in every six-days should be undertaken when the highest dust impact
occurs.
Sampling Procedure and
Monitoring Equipment
3.2.5
High volume samplers (HVSs) in compliance with the
following specifications shall be used for carrying out the 1-hour and 24-hour
TSP monitoring:
 -
0.6
- 1.7 m3 per minute adjustable flow range;
 -
equipped
with a timing / control device with +/- 5 minutes accuracy for 24 hours
operation;
 -
installed
with elapsed-time meter with +/- 2 minutes accuracy for 24 hours operation;
 -
capable
of providing a minimum exposed area of 406 cm2;
 -
flow
control accuracy: +/- 2.5% deviation over 24-hour sampling period;
 -
equipped
with a shelter to protect the filter and sampler;
 -
incorporated
with an electronic mass flow rate controller or other equivalent devices;
 -
equipped
with a flow recorder for continuous monitoring;
 -
provided
with a peaked roof inlet;
 -
incorporated
with a manometer;
 -
able
to hold and seal the filter paper to the sampler housing at horizontal
position;
 -
easily
changeable filter; and
 -
capable
of operating continuously for a 24-hour period.
3.2.6
Initial calibration of dust monitoring equipment
shall be conducted upon installation and thereafter at bi-monthly intervals.
The transfer standard shall be traceable to the internationally recognized
primary standard and be calibrated annually. The concern parties such as IEC
shall properly document the calibration data for future reference. All the data
should be converted into standard temperature and pressure condition.
Laboratory Measurement /
Analysis
3.2.7
A clean laboratory with constant temperature and
humidity control, and equipped with necessary measuring and conditioning
instruments to handle the dust samples collected, shall be available for sample
analysis, and equipment calibration and maintenance. The laboratory should be
HOKLAS accredited.
3.2.8
An alternative non-HOKLAS accredited laboratory was set-up for carrying out the laboratory analysis,
the laboratory equipment was
approved by the ER on 8 February 2011 and the
measurement procedures were
witnessed by the IEC. Any measurement performed by the laboratory was be demonstrated to the satisfaction of the
ER and IEC. IEC shall regularly audit to the measurement performed by the
laboratory to ensure the accuracy of measurement results.
3.2.9
Filter paper of size 8" x 10" shall be
labelled before sampling. It shall be a clean filter paper with no pinholes,
and shall be conditioned in a humidity-controlled chamber for over 24-hours and
be pre-weighed before use for the sampling.
3.2.10
After sampling, the filter paper loaded with dust
shall be kept in a clean and tightly sealed plastic bag. The filter paper shall
then be returned to the laboratory for reconditioning in the humidity
controlled chamber followed by accurate weighing by an electronic balance with
readout down to 0.1 mg. The balance shall be regularly calibrated against a
traceable standard.
3.2.11
All the collected samples shall be kept in a good
condition for 6 months before disposal.
impact monitoring for
odour patrol
3.2.12 Odour patrols
along the shorelines of Causeway Bay Typhoon Shelter and ex-Wan Chai Public
Cargo Working Area when there is temporary reclamation in Causeway Bay Typhoon
Shelter and/or in the ex-Wan Chai
Public Cargo Working Area, or when there is dredging of the odorous sediment
and slime at the south-western corner of the Causeway Bay Typhoon Shelter.
Odour patrols will be carried out at bi-weekly intervals during July, August
and September by a qualified person of the ET who shall:
 -
be
at least 16 years of age;
 -
be
free from any respiratory illnesses; and
 -
not
be allowed to smoke, eat, drink (except water) or use chewing gum or sweets 30
min
 -
before
and during odour patrol
3.2.13 Odour patrol shall be conducted by
independent trained personnel / competent persons patrolling and sniffing
around the shore as shown in
Figure 3.1 to detect any odour at the
concerned hours (afternoon is preferred for higher daily temperature).
3.2.14 The qualified person will use the nose
(olfactory sensor) to sniff odours at different locations. The main odour
emission sources and the areas to be affected by the odour nuisance will be
identified.
3.2.15 The perceived odour intensity is to be
divided into 5 levels which are ranked in the descending order as follows:
 -
0 -
Not detected. No odour perceived or an odour so weak that it cannot be easily
characterized or described;
 -
1 -
Slight Identifiable odour, and slight chance to have odour nuisance;
 -
2 -
Moderate Identifiable odour, and moderate chance to have odour nuisance;
 -
3 -
Strong Identifiable, likely to have odour nuisance;
 -
4 -
Extreme Severe odour, and unacceptable odour level.
3.2.16 The findings including odour intensity,
odour nature and possible odour sources, and also the local wind speed and
direction at each location will be recorded. In addition, some relevant
meteorological and tidal data such as daily average temperature, and daily
average humidity, on that surveyed day will be obtained from the Hong Kong
Observatory Station for reference. The Action and Limit levels for odour patrol
are shown in
Appendix 3.1.
3.3.1.
The
EIA Report has identified that the key water quality impact would be associated
with the dredging works during the construction phase. Marine water quality monitoring for dissolved
oxygen (DO), suspended solid (SS) and turbidity is therefore recommended to be
carried out at selected WSD flushing water intakes. The impact monitoring should be carried out
during the proposed dredging works to ensure the compliance with the water
quality standards.
3.3.2.
The updated EM&A Manual for EP-356/2009
(Version in March 2011) is approval by EPD on 29 April 2011. As such, the
Action Level and Limit Level for the wet season (April  September) will be
effected and applied to the water quality monitoring data from 30 April 2011.
Water Quality Monitoring Stations
3.3.3.
It
is proposed to monitor the water quality at 9 WSD salt water intakes and 14
cooling water intakes along the seafront of the
Table 3.4   Marine Water Quality
Stations for Water Quality Monitoring
Station Ref. |
Location |
Easting |
Northing |
WSD Salt Water Intake |
|||
WSD7 |
|
834150.0 |
818300.3 |
WSD9 |
Tai Wan |
837921.0 |
818330.0 |
WSD10 |
Cha Kwo Ling |
841900.9 |
817700.1 |
WSD15 |
Sai Wan Ho |
841110.4 |
816450.1 |
WSD17 |
|
839790.3 |
817032.2 |
WSD19 |
Sheung Wan |
833415.0 |
816771.0 |
WSD20 |
|
830750.6 |
816030.3 |
WSD21 |
Wan Chai |
836220.8 |
815940.1 |
RW1 |
Wan Chai (Reprovision) |
836188.8 |
815911.1 |
Cooling Water Intake |
|||
C1 |
HKCEC Extension |
835885.6 |
816223.0 |
C2 |
Telecom House |
835647.9 |
815864.4 |
C3 |
HKCEC Phase I |
835836.2 |
815910.0 |
C4e |